South Pars Phases 20-21 - Telecom Package

South Pars Phases 20-21 - Telecom Package

South Pars Phases 20 & 21 Development Project The development project of this phase is awarded to OIEC in the form of EPC (Engineering, Procurement, & Construction). The project will take place in Site 1, Pars Special Economic Energy Zone (PSEEZ) Site 1 in Asalouyeh, Persian Gulf. The main objectives of this project are as follows: Daily Production of 50 MMscm/d treated gas for domestic consumption; Annual Recovery of 1,000,000 tons of ethane, as feedstock for petrochemical industries; Annual Recovery of 1.05 million tons of premium grade LPG for export; Daily production of 75,000 barrels of stabilized and de-sulfurized condensates for export; and Daily Recovery of 400 tons sulfur for export. The scope of work of this development project is as follows: Construction and installation of 2 wellhead platforms equipped with free water knock-out drum (FWKD), test separator, utilities, access bridges and flare platform Drilling of 22 production wells; Installation of two 32 inch sea lines and two 4.5 inch piggy-back lines approximately,212 Km. to transfer glycol; Construction of a stand-alone gas treating refinery in Site 1 of Pars Special Economic Energy Zone Asalouyeh, Bushehr Province; Supplying Electricity from the projects’ common power plant; The required infrastructure. In this project HISTACO is the on shore telecom EPC contractor.

Date

06 August 2019

Tags

Oil & Gas Industry
©2024 Histaco.com All Rights Reserved.

Search