South Pars Phases 20 & 21 Development Project
The development project of this phase is awarded to OIEC in the form of EPC (Engineering, Procurement, & Construction). The project will take place in Site 1, Pars Special Economic Energy Zone (PSEEZ) Site 1 in Asalouyeh, Persian Gulf.
The main objectives of this project are as follows:
Daily Production of 50 MMscm/d treated gas for domestic consumption;
Annual Recovery of 1,000,000 tons of ethane, as feedstock for petrochemical industries;
Annual Recovery of 1.05 million tons of premium grade LPG for export;
Daily production of 75,000 barrels of stabilized and de-sulfurized condensates for export; and
Daily Recovery of 400 tons sulfur for export.
The scope of work of this development project is as follows:
Construction and installation of 2 wellhead platforms equipped with free water knock-out drum (FWKD), test separator, utilities, access bridges and flare platform
Drilling of 22 production wells;
Installation of two 32 inch sea lines and two 4.5 inch piggy-back lines approximately,212 Km. to transfer glycol;
Construction of a stand-alone gas treating refinery in Site 1 of Pars Special Economic Energy Zone Asalouyeh, Bushehr Province;
Supplying Electricity from the projects’ common power plant;
The required infrastructure.