South Pars Phases 22-24 Telecom Package

South Pars Phases 22-24 Telecom Package

The Capacity to Produce from the Reservoir: 2 BSCFPD. Offshore facilities: Number of Wells: 38 Wells Number of offshore platforms: 4 platforms, each used to produce 500 MSCFPD Offshore Pipelines Main Pipelines: Two 32” pipelines to transfer gas from the main platforms to the onshore processing unit, totaling 210km together with two 4.5” pipelines for MEG injection. Infield Pipelines: Two 18” & 20” pipelines to transfer gas from the satellite platforms to the main platforms’ outlets, totaling 14km together with two 4.5” pipelines for MEG injection. Onshore Processing Unit: Gas and input liquids are processed in this processing unit, producing the following products: 50 MSCMPD of refined gas. 1.1 MT/year of liquefied gas for export. 77 thousand barrels/day of gas condensates for export. 1MT/year of Ethane gas to feed the petrochemical plants, BY PRODUCTS: Sulphur (by product of gas sweetening process): 400 MT/day for export. CONTRACTOR (Joint Venture) Petro Sina Arya Company SADRA (Iranian Marine Industrial Co.) HISTACO is the Telecom Package provider for which it has done the engineering and procurement.The package included CCTV, PABX, PAGA, NDB, EMS, RADIO (VHF, UHF, TETRA, MARINE)

Date

22 January 2015

Tags

Oil & Gas Industry
©2024 Histaco.com All Rights Reserved.

Search